<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>Your Industrial &amp; Land Agent — Industrial Property News</title>
<link>https://industrialandland.com.my/news.html</link>
<atom:link href="https://industrialandland.com.my/news/rss.xml" rel="self" type="application/rss+xml" />
<description>Malaysia factory, land and industrial market news with analysis by Scott Seow.</description>
<language>en-my</language>
<item>
<title>EPG tops out US$120m modular data centre factory in Senai</title>
<link>https://industrialandland.com.my/news/epg-modular-data-centre-factory-senai-airport-city-us120m-topping-out.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/epg-modular-data-centre-factory-senai-airport-city-us120m-topping-out.html</guid>
<pubDate>Thu, 12 Nov 2026 08:00:00 +0800</pubDate>
<description>EPG has topped out its US$120m factory at Senai Airport City, Johor, to make modular data centre shelters and generators. Completion is due in 1Q 2027.</description>
</item>
<item>
<title>Southern Score wins RM146.8m Port Dickson data centre jobs</title>
<link>https://industrialandland.com.my/news/southern-score-sjee-rm146-8m-port-dickson-data-centre-electrical.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/southern-score-sjee-rm146-8m-port-dickson-data-centre-electrical.html</guid>
<pubDate>Thu, 12 Nov 2026 08:00:00 +0800</pubDate>
<description>Southern Score Builders&#39; unit SJEE signed two electrical subcontracts worth RM146.8m on 11 Nov 2026 for two data centres in Port Dickson, due by April 2028.</description>
</item>
<item>
<title>LBS sets 2027 launch for RM8.3b The Reserva in Kwasa</title>
<link>https://industrialandland.com.my/news/lbs-the-reserva-kwasa-damansara-rm8-3b-sherwood-residence.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/lbs-the-reserva-kwasa-damansara-rm8-3b-sherwood-residence.html</guid>
<pubDate>Thu, 12 Nov 2026 08:00:00 +0800</pubDate>
<description>LBS will launch 196 landed homes on 24.94 acres in Kwasa Damansara in April or May 2027, the first phase of its RM8.3b, 192-acre The Reserva.</description>
</item>
<item>
<title>Sarawak gazettes 2,326ha of NCR land in Samarahan</title>
<link>https://industrialandland.com.my/news/sarawak-samarahan-ncr-land-gazette-titles-rm5-26m-compensation.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/sarawak-samarahan-ncr-land-gazette-titles-rm5-26m-compensation.html</guid>
<pubDate>Thu, 12 Nov 2026 08:00:00 +0800</pubDate>
<description>Sarawak gazetted 2,326ha of NCR land in Samarahan, gave out 718 land titles and paid RM5.26m for land taken for two public projects on 11 Nov 2026.</description>
</item>
<item>
<title>Rescue developer found for Sibu&#39;s stalled Kemuyang Heights</title>
<link>https://industrialandland.com.my/news/sibu-kemuyang-heights-sick-housing-project-white-knight-rescue.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/sibu-kemuyang-heights-sick-housing-project-white-knight-rescue.html</guid>
<pubDate>Thu, 12 Nov 2026 08:00:00 +0800</pubDate>
<description>A rescue developer has agreed to take over Kemuyang Heights in Sibu, 66 homes about 70% built after 11 years, with no extra payment from buyers.</description>
</item>
<item>
<title>Data centres: 30% green power rule, one-year grid pledge</title>
<link>https://industrialandland.com.my/news/data-centre-rules-30-percent-renewable-tnb-one-year-cress-14-sen.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/data-centre-rules-30-percent-renewable-tnb-one-year-cress-14-sen.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Data centres must use at least 30% renewable energy. TNB pledges a grid link within a year of approval, and the CRESS developer charge stays at 14 sen/kWh.</description>
</item>
<item>
<title>Impact Capital IPO at 22 sen; new Klang Valley, JB offices</title>
<link>https://industrialandland.com.my/news/impact-capital-ipo-22-sen-klang-valley-johor-bahru-offices.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/impact-capital-ipo-22-sen-klang-valley-johor-bahru-offices.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Kuching IT firm Impact Capital lists 24 Nov after a 22 sen IPO. RM4.67m of the RM21.27m it raises goes to new rented offices, the biggest in the Klang Valley.</description>
</item>
<item>
<title>Ann Joo wins RM61.89m grid link job for 100MW solar plant</title>
<link>https://industrialandland.com.my/news/ann-joo-rm61-89m-grid-link-100mw-solar-plant-north.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/ann-joo-rm61-89m-grid-link-100mw-solar-plant-north.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Ann Joo&#39;s unit IAC Infrastructure will build the grid connection and transmission line for a 100MW solar plant in the north for RM61.89m, due by Q3 2027.</description>
</item>
<item>
<title>Oriental Interest drops RM280m motorcycle deal</title>
<link>https://industrialandland.com.my/news/oriental-interest-drops-rm280m-chin-hin-jitra-motorcycle-deal.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/oriental-interest-drops-rm280m-chin-hin-jitra-motorcycle-deal.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Oriental Interest has called off buying Kedah motorcycle dealer Chin Hin (Jitra) from its controlling group for RM280m. Its 4Q profit fell 36% to RM25.2m.</description>
</item>
<item>
<title>Tanjong Bungah seaside park proceeds with residents&#39; input</title>
<link>https://industrialandland.com.my/news/tanjong-bungah-seaside-pocket-park-residents-requests.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/tanjong-bungah-seaside-pocket-park-residents-requests.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Penang says the Tanjong Bungah Seaside Pocket Park&#39;s latest design takes in nearly all residents&#39; requests, with one issue left. Residents dispute that.</description>
</item>
<item>
<title>InterContinental Penang Resort to open in December</title>
<link>https://industrialandland.com.my/news/intercontinental-penang-resort-teluk-bahang-december-opening.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/intercontinental-penang-resort-teluk-bahang-december-opening.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>IHG&#39;s first InterContinental resort in Malaysia opens in Teluk Bahang in December with 348 rooms, reviving the Penang Mutiara Beach Resort, shut since 2006.</description>
</item>
<item>
<title>PMW wins RM64.37m more TNB pole supply, contract at RM148m</title>
<link>https://industrialandland.com.my/news/pmw-tnb-rm64-37m-spun-concrete-poles-supplemental-agreement.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/pmw-tnb-rm64-37m-spun-concrete-poles-supplemental-agreement.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>PMW International&#39;s unit signed a second supplemental agreement with TNB worth RM64.37m for concrete poles to December 2027, lifting the contract to RM148.05m.</description>
</item>
<item>
<title>Columbia Asia owner Asia OneHealthcare files for Bursa IPO</title>
<link>https://industrialandland.com.my/news/asia-onehealthcare-ipo-columbia-asia-sjmc-draft-prospectus.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/asia-onehealthcare-ipo-columbia-asia-sjmc-draft-prospectus.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Asia OneHealthcare, owner of SJMC, Columbia Asia and two Penang hospitals, filed a draft prospectus for a Bursa IPO of up to 4.38 billion shares.</description>
</item>
<item>
<title>Unigel Global to buy a Klang factory with its IPO money</title>
<link>https://industrialandland.com.my/news/unigel-global-ipo-ready-built-factory-klang.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/unigel-global-ipo-ready-built-factory-klang.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Fibre-optic gel maker Unigel Global plans to buy a ready-built Klang factory on about 70,000 sq ft of land with ACE IPO money, and leave its rented Kapar plant.</description>
</item>
<item>
<title>Mitsubishi Materials to end Johor copper strip work by 2027</title>
<link>https://industrialandland.com.my/news/mitsubishi-materials-ryoshindo-johor-copper-strip-closure-2027.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/mitsubishi-materials-ryoshindo-johor-copper-strip-closure-2027.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Mitsubishi Materials will stop slitting and selling copper strip at its Johor unit Ryoshindo Manufacturing by March 2027 and supply from Japan instead.</description>
</item>
<item>
<title>Vertex Material plans US$300–400m Nasdaq listing in 2027</title>
<link>https://industrialandland.com.my/news/vertex-material-nasdaq-listing-2027-us300m-400m.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/vertex-material-nasdaq-listing-2027-us300m-400m.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Subang-based copper-composite maker Vertex Material plans a Nasdaq listing in 2Q–3Q 2027 to raise US$300–400m and build a factory in Arizona.</description>
</item>
<item>
<title>Kee Ming wins RM44.17m Puncak Alam data centre job</title>
<link>https://industrialandland.com.my/news/kee-ming-rm44-17m-puncak-alam-hyperscale-data-centre.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/kee-ming-rm44-17m-puncak-alam-hyperscale-data-centre.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Ipoh-based Kee Ming won a RM44.17m electrical subcontract for a hyperscale data centre in Puncak Alam. In September it won M&amp;E work on a Valdor warehouse.</description>
</item>
<item>
<title>Axis REIT pays 2.35 sen for 3Q; four buys still pending</title>
<link>https://industrialandland.com.my/news/axis-reit-3q2026-results-pending-deals-penang-leases.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/axis-reit-3q2026-results-pending-deals-penang-leases.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Axis REIT paid 2.35 sen for 3Q 2026 with 93% occupancy. Four buys worth RM288.6m, including RM113m in Kulim, are pending and three properties sit empty.</description>
</item>
<item>
<title>SLGC wins RM50.24m job for Telok Panglima Garang factories</title>
<link>https://industrialandland.com.my/news/slgc-rm50-24m-detached-factories-telok-panglima-garang.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/slgc-rm50-24m-detached-factories-telok-panglima-garang.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Newly listed SLGC will design and build detached factories on Lot 2465, Mukim Telok Panglima Garang, for ALH Construction under a RM50.24m contract.</description>
</item>
<item>
<title>Signature Alliance to rebuild Underwater World Langkawi</title>
<link>https://industrialandland.com.my/news/signature-alliance-rm51-56m-underwater-world-langkawi-redevelopment.html</link>
<guid isPermaLink="true">https://industrialandland.com.my/news/signature-alliance-rm51-56m-underwater-world-langkawi-redevelopment.html</guid>
<pubDate>Wed, 11 Nov 2026 08:00:00 +0800</pubDate>
<description>Signature Alliance will redevelop Underwater World Langkawi in Pantai Cenang for Eden Inc under a RM51.56m, 18-month contract starting 13 November 2026.</description>
</item>
</channel>
</rss>